| Availability: | |
|---|---|
| Quantity: | |
DKS-300
YAWEI
-
The 300kVA 33kV/415V three-phase oil immersed distribution transformer is designed for medium-voltage distribution networks that require reliable conversion to a 415V low-voltage supply. With a 33kV primary rating, 415V secondary rating, and ZNyn11 connection group, it provides a practical solution for distributing electrical power to residential, commercial, agricultural, and industrial loads.
Its oil immersed construction provides both electrical insulation and an effective path for transferring heat generated during operation. The transformer can be configured according to the installation environment, electrical system requirements, and applicable project standards.
The 33kV primary voltage makes this transformer suitable for medium-voltage distribution networks where higher distribution voltage is required. It provides an efficient step-down interface between the utility or local medium-voltage network and the 415V low-voltage system.
With a rated capacity of 300kVA, the transformer is designed to supply three-phase electrical loads across a range of distribution applications. The 415V secondary output can support building services, machinery, lighting, motors, and other low-voltage equipment.
The active core and windings operate within insulating oil, which provides electrical insulation while facilitating heat transfer. This proven transformer configuration helps maintain stable operating conditions and supports reliable long-term service.
The ZNyn11 connection group provides the specified neutral arrangement and phase relationship between the high-voltage and low-voltage windings. It can be selected to match the requirements of particular distribution networks and system designs.
The transformer is manufactured with carefully selected core, winding, insulation, and tank components. Structural integrity and electrical performance are considered throughout the design and production process to support dependable operation under normal service conditions.
>> Technical Parameters
| Type | Three‑phase oil‑immersed distribution transformer |
| Model | DKS-300kVA |
| Installation | Outdoor |
| Altitude | ≤1000m |
| Rated Power | 300 KVA or others |
| Cooling Method | ONAN |
| Primary Voltage | 33 kV |
| Secondary Voltage | 0.415 kV |
| Rated Frequence | 50/60HZ |
| Insulation oil | Mineral oil |
| Tapping Range | ±2×2.5%/±5% |
| Temperature rise℃) | 65 K |
| Connection Group | Znyn11 |
| Total weight(kg) | Depends on final design |
The 300kVA 33kV/415V oil immersed distribution transformer is suitable for a broad range of medium-voltage power distribution projects. Typical applications include residential developments, commercial facilities, factories, agricultural installations, infrastructure projects, utility networks, and rural electrification systems.
The 415V secondary supply can be used for building electrical systems, lighting networks, motors, pumps, agricultural machinery, small industrial equipment, and other low-voltage loads. The transformer can also serve as part of a larger distribution system where dependable medium-voltage power conversion is required.
YAWEI maintains quality control throughout the manufacturing process of its three-phase oil immersed distribution transformers. Incoming materials and major components are inspected before entering production, while manufacturing processes are monitored through core assembly, winding, insulation, tank fabrication, oil treatment, final assembly, and testing.
Before shipment, each transformer is subjected to applicable routine factory inspections and electrical tests. Depending on the project specification and relevant standards, these may include voltage ratio, winding resistance, insulation performance, dielectric withstand, no-load characteristics, and other specified tests.
This systematic inspection process helps verify the transformer's electrical characteristics, mechanical integrity, and overall manufacturing quality before delivery.
With more than 30 years of transformer manufacturing experience, YAWEI provides distribution and power transformer solutions for customers in international markets.
Our capabilities cover transformer engineering, manufacturing, testing, and project-specific configuration. Based on customer requirements, we can develop suitable solutions covering rated capacity, voltage ratio, frequency, connection group, impedance, tap range, cooling arrangement, installation conditions, and applicable technical standards.
By combining manufacturing experience with controlled production and systematic testing, YAWEI aims to provide reliable transformer equipment and professional support for diverse power distribution projects.
The following information provides general guidance for the installation and commissioning of the 300kVA 33kV/415V oil immersed distribution transformer. Installation, electrical connection, testing, and energization must be carried out by qualified personnel in accordance with the manufacturer's technical documentation, approved drawings, local regulations, and applicable electrical safety requirements.
Inspect the installation area before positioning the transformer. The foundation or supporting structure should be level, stable, and capable of safely supporting the equipment. Sufficient clearance should be provided for electrical connections, ventilation, inspection, maintenance, and safe operation.
Transport and position the transformer using suitable lifting and handling equipment. Use the designated lifting points and follow the manufacturer's handling instructions. Once positioned, confirm that the transformer is correctly aligned and securely fixed before beginning electrical installation.
Before assembly, inspect the transformer and accessories for any transportation-related damage. Check bushings, terminals, grounding components, mounting hardware, and other supplied accessories. Install and tighten the required components according to the manufacturer's drawings and technical instructions.
Connect the 33kV high-voltage side and 415V low-voltage side according to the transformer nameplate, wiring diagram, and approved electrical design. Verify phase identification, neutral connections, grounding, conductor clearances, and terminal tightness before energization.
Before placing the transformer into service, qualified electrical personnel should complete the required visual, mechanical, and electrical inspections. Depending on the applicable specification, tests may include insulation resistance, winding resistance, voltage ratio, phase relationship, dielectric withstand, grounding continuity, and other routine tests.
The transformer should only be energized after all required inspections and test results have been confirmed to comply with the specified requirements and the complete installation has been verified as safe.